Home Business Investments Major Rehab Efforts Launch on Accra-Kumasi Highway

Major Rehab Efforts Launch on Accra-Kumasi Highway

0
Major Rehabilitation Work Begins On Accra Kumasi Highway
Major Rehabilitation Work Begins On Accra Kumasi Highway

Rehabilitation work has commenced on the Apedwa-Ejisu stretch of the Accra-Kumasi Highway to restore the pavement’s riding quality and improve safety and traffic flow.

The 160km Apedwa-Ejisu section is a critical highway connecting Accra to Kumasi and passes through key economic towns such as Bunso Junction, Anyinam, Konongo, and Ejisu.

The Minister for Roads and Highways, Mr Francis Asenso-Boakye, who inspected the rehabilitation works, emphasized the corridor’s vital role in linking the country’s two largest economic cities.

“Over the years, this important road has experienced extensive deterioration, with defects such as potholes, cracks, rutting, and depressions affecting large sections of the carriageway.

Despite various interventions to maintain these sections, the road has continued to deteriorate significantly, necessitating a more comprehensive solution,” the Minister said.

He indicated that given its strategic importance, the government had taken a bold decision to rehabilitate the corridor.

Mr Asenso-Boakye explained that the 160km stretch had been divided into two lots; Lot 1 from Ejisu to Nkawkaw (90km) and Lot 2 from Nkawkaw to Apedwa (70km).

He said the scope of work for the project included pavement strengthening, asphalt overlays, and the installation of road furniture.

The rehabilitation work, the Roads and Highway Minister said, was scheduled to be completed in 24 months and upon completion, it would significantly enhance travel safety, reduce journey times, and boost economic activities between Accra and Kumasi.

Mr Asenso-Bokye also indicated that the Government was currently constructing four major bypasses along the Accra-Kumasi highway at Osino, Enyiresi, Anyiman and Konogo to “help reduce travelling time, accidents and promote economic activities along the major towns on the corridor.”

The Minister directed the contractors to put in place a robust traffic management plan to reduce inconvenience to commuters.

He further appealed to motorists applying the stretch to drive safely and adhere to traffic control measures that have been put in place by the contractors.

Send your news stories to newsghana101@gmail.com Follow News Ghana on Google News

NO COMMENTS

LEAVE A REPLY

Please enter your comment!
Please enter your name here

error: Content is protected !!
WP Radio
WP Radio
OFFLINE LIVE
Exit mobile version